Approvals · Planning + Building

Approval is a design problem, not a paperwork problem.

Planning entitlements and building permits across Los Angeles County, Malibu, the Coastal Zone and Ventura County, coordinated by the team that drew the project.

The idea

The projects that get approved are the ones designed to be approvable.

Setbacks, height, lot coverage, grading limits, view corridors, hillside ordinances, fire access and coastal requirements are constraints that shape the building. Treating them as a submittal step rather than a design input is how projects lose years in review.

Apel Design carries entitlement strategy from the first feasibility study through plan check responses, so the design that goes to hearing is one the agency can approve and the client still wants to build.

Knowledge + experience

Two distinct approvals, one coordinated path.

Requirements vary by jurisdiction, zone and project. Every path is confirmed against the governing agency.

Zoning + code analysis

Setbacks, height, lot coverage, floor area, parking and overlay requirements established before design begins.

Discretionary entitlements

Conditional use permits, variances, site plan review, and the hearings and exhibits each requires.

Coastal Development Permits

Coastal Zone applications, Feasible Alternatives Analyses and Coastal Commission coordination.

Hillside + grading approvals

Grading ordinance compliance, slope analysis and hillside development standards.

Environmental review

CEQA pathway coordination, exemptions, and the studies required to support them.

Building plan check

Building, fire, health and public works review, comment tracking and resubmittal.

Agency coordination

Direct coordination with planning staff, plan checkers, fire and utility agencies through review.

Conditions of approval

Tracking conditions from approval through construction so nothing surfaces late.

The path

Analyze, position, submit, resolve.

01

Analyze

Establish the governing code, zone, overlays and the realistic approval path before design commits.

02

Position

Shape the design so it meets the standards it can, and has a defensible case where it cannot.

03

Submit

Prepare applications, exhibits and supporting studies for the correct review body.

04

Resolve

Answer comments, attend hearings, and carry conditions of approval into the construction documents.

Questions

Useful clarity before the first conversation.

How long do entitlements take in Malibu or the Coastal Zone?

It depends entirely on the site, the permit type and whether the project triggers discretionary review. Coastal Development Permits and hillside approvals typically run considerably longer than a by-right building permit, and no responsible estimate can be given before a zoning analysis.

What is the difference between entitlements and permits?

Entitlements are the land use approvals that establish what may be built. Building permits confirm that the construction documents meet code. Entitlements come first, and a project can hold entitlements for years before it pulls a permit.

Can Apel Design handle approvals for a project it did not design?

In many cases yes, though the work is more predictable when the entitlement strategy informs the design from the start.

Who signs the architectural drawings?

Architectural services are performed by Apel Design in association with Michael B. Maclaren, AIA, under the applicable project agreement.

One continuous thread

These do not happen in isolation.

Site engineering, approvals, documentation and building systems all constrain each other. On our projects they are resolved together, by one team, rather than handed between consultants.

Bring us the site, the constraint, or the approval that has to happen.