Keep the design intent present where the work is actually made.

Construction management and coordination informed by drawings, approvals, materials, trades, budget, sequence, documentation and the changing reality of the field.

Professional credentialsCreative direction with accountable professional delivery.
Architecture + designApel Design, working in conjunction with Michael B. Maclaren, AIA.
Licensed residential constructionCreative New Dimension Inc

California General Building Contractor · Class B · CSLB #1056632

The idea

A good set of drawings is essential. It is not the end of decision-making.

Construction brings design, engineering, labor, materials, access, weather, inspections, procurement and money into the same daily environment. Small unresolved interfaces can quickly become expensive or visible.

Apel Design keeps a direct line between architectural intent and field information, with construction responsibilities assigned through the appropriate project agreements and licensed entities.

Knowledge + experience

The operating work behind a controlled build.

Depending on scope and delivery structure, coordination can address the following project responsibilities.

Schedule + trades

Milestones, subcontractor sequencing, site logistics, access and dependencies between scopes.

Budget + documentation

Budget tracking, invoices, change information, allowances and owner decisions organized around current information.

Materials + procurement

Selections, lead times, purchasing coordination, delivery, storage, samples and shop drawings.

Consultants + inspections

Design-team responses, field questions, city and deputy inspections, and specialty coordination.

Quality review

Mockups, key details, installations, punch observations and visible alignment with the design intent.

Project records

Current drawings, submittals, meeting decisions, photographs, open items and responsibility tracked in one working system.

The path

Information moves. Responsibility stays clear.

01

Prepare

Confirm agreements, documents, baseline scope, schedule, reporting and lines of responsibility.

02

Coordinate

Bring trades, consultants, materials, inspections and owner decisions into the active sequence.

03

Document

Record changes, costs, questions, approvals, site observations and current information.

04

Close

Complete inspections, punch work, turnover information and final coordination.

Questions

Useful clarity before the first conversation.

Is Apel Design the licensed contractor?

Apel Design is the architectural and design company. Architecture is performed in association with Michael B. Maclaren, AIA. Licensed construction is provided by Creative New Dimension Inc, California B 1056632, in conjunction with Apel Design for Design-Build.

Can construction coordination begin during design?

Yes. That is often where it has the greatest value, because scope, constructability, cost, sequence and procurement can influence design before work reaches the field.

Is the service identical for every project?

No. The agreement should define the delivery structure, responsible entity, authority, reporting and exact management or coordination scope for the particular project.

One continuous thread

These do not happen in isolation.

Site engineering, approvals, documentation and building systems all constrain each other. On our projects they are resolved together, by one team, rather than handed between consultants.

Bring us the ambition, the difficult site, or the project that needs to become clear.