The ground, the water, and the utilities decide what the building can be.

Civil engineering and utility coordination for hillside, coastal and infill sites across Los Angeles and Ventura County, from grading and drainage through service connections.

The idea

Most projects are won or lost below the finish floor.

Grading, drainage, retaining, septic or sewer, water service, power, and fire access are not details resolved after the design. On a hillside or coastal site they set the buildable envelope, the pad elevation, the driveway slope, and often the entire massing.

Apel Design coordinates civil engineering alongside the architecture from the first site study, so the drawings that reach plan check already reconcile the building with the ground it sits on and the services it needs.

Knowledge + experience

Site engineering carried through approval and construction.

Scope varies by site, jurisdiction and the licensed engineers of record on each project.

Grading + earthwork

Cut and fill strategy, pad elevations, slope stability coordination, haul quantities and grading permit exhibits.

Drainage + hydrology

Storm water management, area drains, detention, dissipation, and low impact development requirements.

Retaining + slope

Retaining wall coordination with structural and geotechnical engineers on hillside and canyon sites.

Septic + sewer

Onsite wastewater feasibility, percolation coordination, leach field siting, or sewer connection and lateral routing.

Water + fire service

Domestic water sizing, fire flow requirements, hydrant locations, tanks and pump coordination where required.

Dry utilities

Power, gas, and communications routing, service points, transformer siting, and undergrounding coordination.

Driveways + access

Access grades, turnarounds, fire department access requirements and encroachment permitting.

Erosion + SWPPP

Erosion control planning and storm water pollution prevention documentation during construction.

The path

Survey, test, resolve, and connect.

01

Survey

Establish existing conditions, topography, boundaries, easements and existing service locations.

02

Test

Coordinate geotechnical and percolation testing so soil and wastewater assumptions are verified early.

03

Resolve

Reconcile grading, drainage, retaining and access with the architecture before the design is fixed.

04

Connect

Coordinate utility service, agency approvals and construction sequencing through to occupancy.

Questions

Useful clarity before the first conversation.

Does Apel Design perform civil engineering directly?

Civil engineering is performed by licensed civil engineers of record. Apel Design coordinates that work alongside the architecture and manages the interfaces between civil, structural, geotechnical and the building design.

Why does civil work matter so much on Malibu and hillside sites?

Slope, soil, drainage and the absence of sewer service in many areas mean the civil constraints often determine the pad location, the building footprint and the achievable square footage before the architecture begins.

When should civil engineering start?

At feasibility. Survey and preliminary grading and drainage strategy should inform the first massing studies, not follow them.

Can you coordinate septic where there is no sewer?

Yes. Onsite wastewater treatment feasibility, percolation testing coordination and leach field siting are routine parts of the work on unsewered sites.

One continuous thread

These do not happen in isolation.

Site engineering, approvals, documentation and building systems all constrain each other. On our projects they are resolved together, by one team, rather than handed between consultants.

Bring us the site, the constraint, or the approval that has to happen.