Working from abroad
Most of our clients are not standing on the site, and it does not slow the work down.
A good number of the people who build here live somewhere else: New York, London, Zurich, Hong Kong, Shanghai. The distance matters less than the number of parties involved. What makes a remote project difficult is a design team, a contractor, a civil engineer and a permit expediter all reporting separately to somebody eight time zones away. This studio is organised the other way: architecture, interiors, site engineering, approvals and construction delivery sit together, so there is one account of where the project stands rather than five.
For owners who cannot be here, the studio also acts as the client's representative on the ground, which is the part that usually decides whether a distance project goes well. Someone attends the site, sits in the meetings with the city, reviews what has been built against what was drawn, and reports back. Decisions that genuinely need the owner are put in front of them properly, with the options and the consequences, rather than as a question at the end of an email.
The approvals are the other half. California permitting is slow and local, and an owner abroad has no practical way to run it. Zoning, design review, hillside and coastal rules, historic districts and utility connections are handled here as part of the design rather than handed over as a separate task.